Local Law 87 energy audits: finding your year and filing on time

Local Law 87 requires larger New York City buildings to run an energy audit and retro-commissioning every ten years. The result goes to the Department of Buildings as an Energy Efficiency Report. Your filing year is not a date anyone sends you. It is the calendar year whose last digit matches the last digit of your tax block number.
That single rule is why boards miss this one. A building on block 4216 files in 2026. The building across the street on block 4213 files in 2033. Nothing about the two buildings looks different, and no notice arrives to tell either board which year is theirs.
Below is the whole cycle in order, from working out whether you are covered to the two ways out if you are not ready.
Step 1: find out whether Local Law 87 applies
Three thresholds, measured by the square footage on your Department of Finance record rather than your own count.
- A building greater than 50,000 gross square feet
- A tax lot holding two or more buildings that together exceed 100,000 gross square feet
- Two or more buildings held in condominium form of ownership that together exceed 100,000 gross square feet
Notice the gap between this and the other energy laws. Local Law 84 benchmarking starts at 25,000 square feet, and so does Local Law 88. Local Law 87 starts at 50,000. A 35,000 square foot co-op benchmarks every year and never files an Energy Efficiency Report.
If your building is on the Covered Buildings List and you believe the square footage is wrong, the dispute goes to the Department of Finance rather than to Buildings.
Step 2: find your year
Take the last digit of your tax block number. That is the last digit of every year you file.
| Last digit of your block | Your filing years |
|---|---|
| 0 | 2030, 2040 |
| 1 | 2031, 2041 |
| 2 | 2032, 2042 |
| 3 | 2033, 2043 |
| 4 | 2034, 2044 |
| 5 | 2025, 2035 |
| 6 | 2026, 2036 |
| 7 | 2027, 2037 |
| 8 | 2028, 2038 |
| 9 | 2029, 2039 |
Your block number is the middle part of your borough, block and lot number, which appears on your property tax bill. Take the block, not the lot.
This is the second law keyed to your block number. Local Law 11 facade cycles use the same digit for a different purpose, which means a board that has already looked this up for its facade schedule has done half the work.
Step 3: understand what you are buying
Two separate pieces of work sit behind one report.
The energy audit is a survey and analysis of how the building uses energy, written to find ways to cut consumption without hurting how the building runs. It produces a list of measures with costs and expected savings.
Retro-commissioning is the part boards underestimate. It checks that the systems already in the building are installed the way they were designed, tested to confirm they work, and capable of being run and maintained the way the owner needs. In plain terms, it makes the equipment you already own do what it was supposed to do.
The distinction matters at budget time. An audit tells you what you could buy. Retro-commissioning usually finds things that cost very little and were simply never set up correctly: a control schedule nobody changed when the building’s use changed, a valve left in the wrong position, a sensor reading wrong for years.
Step 4: hire the right professional
The Energy Efficiency Report must be filed by a registered design professional. The Department issued a service notice on this specifically, which tells you how often somebody tried to file it another way.
Two questions are worth asking any firm quoting the work. Who signs the report. And whether the price covers the retro-commissioning measures or only the audit. Those are frequently quoted separately, so a board comparing two numbers may be comparing two different scopes.
Step 5: file
Reports go to the Department by email, to the Local Law 87 address, using the Department’s own forms and reporting tools. The energy audit side uses the US Department of Energy’s Asset Score Audit Template. Retro-commissioning uses the Department’s Excel based Retro-Commissioning Tool.
One thing to clear before you file: the Department will not accept an Energy Efficiency Report submission while penalties on the building are outstanding. If your building is carrying an unpaid civil penalty from anything in this program, clear it before you file rather than after, or the filing bounces and the clock keeps running.
The deadline in your assigned year is December 31. The Department has moved it by service notice before, most recently to March 31 for the 2026 filing year, so check the current notices rather than assuming either date.
The deferral most boards never hear about
This is the part of Local Law 87 worth knowing even if you are not due for years.
A building can defer its filing entirely if it can show that it already meets the New York City Energy Conservation Code. Two routes qualify:
- The building is less than ten years old at the start of the first year it is due to comply, and all base building systems comply with the energy code
- The building has undergone substantial rehabilitation within the ten years before its assigned year, certified by a registered design professional, with all base building systems complying with the code in effect for new buildings constructed on or after July 1, 2010 or on the date of the rehabilitation, whichever is later
The application is form EER1, and the deadline to file it is December 31.
Read that second route again if your building has done a major capital project. A co-op that replaced its heating plant, controls and distribution inside the last decade may already have bought the thing the audit would recommend, and the city will accept that instead of a report. Our view is that any board with a substantial rehabilitation in the last ten years should price the deferral application before it prices the audit, because the two are not close in cost.
There is also an extension, form EER2, for boards that need more time rather than a way out.
What this looks like on a well run building
Here is the sequence we would run for a building due in 2028.
In 2026 the board confirms the filing year and checks whether a deferral is realistic. In early 2027 the firm is selected and the scope is agreed, audit and retro-commissioning priced separately so the board can see both. The work happens through 2027, which matters because an audit across a heating season tells you more than one run in July. The report is drafted in the fall and filed well before the December 31 deadline, with any outstanding penalties cleared first.
Nothing in that sequence is clever. It is just started eighteen months earlier than most boards start it.
Where Local Law 87 is not your biggest problem
If your building is between 25,000 and 50,000 square feet, you are outside this law and inside the other two. Benchmarking under Local Law 84 and the lighting and sub-metering work under Local Law 88 are your energy obligations, and a consultant quoting you for a Local Law 87 audit should be asked to point at which threshold you cross.
And if your building is over its Local Law 97 carbon limit, the audit is useful but it is not the urgent item. The penalty clock on Local Law 97 runs annually whether or not you have an audit in hand.
How we handle it
We manage 35 buildings and about 2,000 units across Manhattan, Queens and Brooklyn, most of them cooperatives, and every building’s compliance calendar is planned a year ahead and visible to the board in its portal. A building due in 2028 is a line item in the 2027 budget conversation, not a scramble in November.
The three questions boards ask us most are who is behind on maintenance, what is in the accounts, and what is on the agenda. Energy filings never make that list, which is exactly why they belong to the managing agent rather than to a volunteer.
Talk to us about your building
Send us your block number and your square footage and we will tell you which of the energy laws you are actually inside.
Tell us about your building or schedule a meeting.
Local Law 87 is one of several cycles running at once. Our guide to the NYC local laws puts them side by side, Local Law 84 benchmarking covers the annual filing that feeds this one, and the Local Law 97 post covers the carbon limit the audit is usually trying to help you meet.
Frequently asked questions
How do I find my Local Law 87 filing year?
Take the last digit of your tax block number, which is the middle number in your borough, block and lot number on your property tax bill. Your filing year is the year ending in that digit. A block ending in 6 files in 2026 and again in 2036.
Is an energy audit the same as retro-commissioning?
No, and a quote that covers one is not covering the other. The audit analyzes how the building uses energy and recommends measures. Retro-commissioning checks that the systems already installed are working the way they were designed to and can be operated and maintained properly.
Who can file the Energy Efficiency Report?
A registered design professional. The Department issued a service notice making that explicit, so a report prepared by anyone else will not satisfy the requirement.
Can we get out of filing altogether?
Sometimes. A building under ten years old whose base systems meet the energy code, or one that has had a substantial rehabilitation in the previous ten years certified by a registered design professional, can apply to defer using form EER1 by December 31. It is worth checking before commissioning an audit.
What if we have unpaid penalties on the building?
Clear them first. The Department will not accept an Energy Efficiency Report submission while penalties are outstanding, so an unpaid balance from a previous cycle can block a filing you thought was done.
Does Local Law 87 apply to a 40,000 square foot co-op?
Not on its own. The single-building threshold is greater than 50,000 gross square feet. A 40,000 square foot building can still be pulled in if it shares a tax lot with other buildings that together exceed 100,000 square feet, or if it is one of two or more condominium buildings that together exceed 100,000.
More Articles
Local Law 88: the lighting and sub-metering deadline that already passed